Ray Brezina is discussing the pressurized water system and how
it is installed. Students do all of the work on the system with remarkably good
results. Only occasionally are the connections in need of redoing.
02/21/2002: Movie 1
This movie shows the students lifting the wall into place.
Instructors are helping direct the action making sure it is done safe and correct.
02/21/2002: Movie 1 (MPG)
In this clip a concrete professional is showing one of the students
the proper way of moving a pump hose. If moved incorrectly the hose would kink
and cause the operator to be thrown.
02/19/2002: Movie 1 (MPG)
Chuck Curran is showing a student the proper way of operate a
reciprocating saw. The student is cutting the treated plate out of the door
opening in the garage.
02/05/2002: Movie 1, Movie
2, Movie 3(MPG)
12/12/2001: Movie 1, Movie
2, Movie 3(.MPG)
Description:
Figure No. 1
At the beginning of each semester students must
be instructed on a variety of subjects before
they are allowed to go to work on the project
house. In this picture instructor Ray Brezina
is talking to the students about safety issues
in construction. Students will spend a week going
over safety, terminology and basic math. After
they pass the required tests they will be allowed
to use power equipment, with supervision, and
learn construction.
Figure No. 2
Students in this picture are being taught about
rafters and blocking. Instructor Chuck Curran
is showing the students the proper way of nailing
blocks into a rafter.
Figure No. 3
Students are taught how to use a variety of power
tools used in construction. In this picture, a
student is being schooled in the proper use of
a radial arm saw.
|